Updated on
Summary The long hours of electricity loadshedding has continuously bothering the faithful.
The citizens are getting no relief from loadshedding despite decrease in shortfall of electricity. According to Multan Electric Power Supply Company (MEPCO), the shortfall of electricity was reduced to 375 megawatt in Multan region whereas the demand of electricity was recorded at 2775 MW.At least 8 to 9 hours of loadshedding is being observed in the urban areas of Multan region while the people in the rural areas are facing 10 to 12 hours of power outage.The power shutdown during sehar and iftar timings is creating problems for the people of Multan.
