Updated on
Summary Load shedding for long hours during the night never let people sleep in Karachi.
KESC, on the other hand, reduced the supply blaming Sui Southern Gas for cutting the supply. Announced load shedding continues for 11 hours. In various other parts of the city power cut goes on up to 15 hours. Deteriorating infrastructure is also responsible for frequent power cuts as fault in PMT, and wires are a routine matter.
