Updated on
Summary PM Gilani had asked Ministry of Water and Power to stop loadshedding during Pak-india match.
However, in some areas loadshedduing continued as usual.Prime Minister Syed Yusuf Raza Gilani had directed the Ministry of Water and Power not to do loadshedding during the live telecast of Pakistan-India cricket match on Sunday.On the other hand, the Ministry of Water and Power said that the shortfall in supply of electricity has reached 4,500MW due to which eight hour continuous supply of power is not possible. According to the ministry continuous power supply will damage Central Power Control System.
Featured
