Iran aims to restore majority of refining capability within two months, oil ministry official says

Iran aims to restore majority of refining capability within two months, oil ministry official says
Updated on

Summary Deputy ​Minister of Oil Sadeq ‌Azimifar ⁠told the Student News Network that repair work had begun ​and ​that ⁠part of the Lavan refinery ​is expected to ​resume ⁠operations within about 10 days

DUBAI (Reuters) – Iran expects to restore most ​damaged refining and ‌distribution facilities to 70-80% of their pre-attack ​capacity within one ​to two months, a senior oil official ​said, as authorities ​work to recover from a wave of strikes on ​energy infrastructure.

Deputy ​Minister of Oil Mohammad Sadeq ‌Azimifar told the Student News Network that repair work had begun ​and ​that part of the Lavan refinery ​is expected to ​resume operations within about 10 days, with other ​units coming ​back online gradually.

 

Browse Topics